A Permit-to-Work moves through a clear, enforced chain — so the right people sign off in the right order, every time.
A dedicated Subcontractor Safety Assessment runs before the main safety review — six stages instead of five, with the same clarity throughout.
The supervisor raises the Permit-to-Work right where the work happens. Everything the permit needs is captured up front, so it lands in the queue complete and ready to review.
Trade-in-charge, safety and the project manager each review in turn. Nothing advances until the stage before it is signed — and every decision is recorded against a name.
When the work is done the permit is acknowledged and closed. The full, time-stamped history stays on file, so you're ready the moment an inspector asks.