How it works

From application to closure, in five steps.

A Permit-to-Work moves through a clear, enforced chain — so the right people sign off in the right order, every time.

1 ApplySupervisor 2 VerifyTrade In Charge 3 AssessSafety Assessor 4 ApproveProject Manager 5 CloseCompletion

Subcontractor permits add a step

A dedicated Subcontractor Safety Assessment runs before the main safety review — six stages instead of five, with the same clarity throughout.

+1safety step
Step 1 · Apply

A permit takes minutes — on site, on the phone.

The supervisor raises the Permit-to-Work right where the work happens. Everything the permit needs is captured up front, so it lands in the queue complete and ready to review.

  • Raised and tracked from any phone
  • Arrives complete — no half-finished permits
Submitted
Steps 2–4 · Review

The right people sign off, in the right order.

Trade-in-charge, safety and the project manager each review in turn. Nothing advances until the stage before it is signed — and every decision is recorded against a name.

  • Enforced sequence — no stage skipped
  • One clear, recorded decision at every gate
Step 5 · Close

Closed out — and on the record for good.

When the work is done the permit is acknowledged and closed. The full, time-stamped history stays on file, so you're ready the moment an inspector asks.

  • Nothing lost between application and closure
  • Inspection-ready audit trail, built automatically